Rapid Business Turnaround For Two Steel Plants

The Situation

Achieving performance improvement missions at an Indian family-controlled steel business.

Heavy losses led our client to seek significant cost reduction in its two steel plants. 

Plant A: New investments had increased capacity significantly, but mean time between failure (MTBF) was low. 

Plant B: This was a new steel plant, but its hot rolling was a bottleneck. The objective was to increase throughput by 50%. 

The Solution

WIL Group quickly put in place a team of experts (MTBF, total productive maintenance and metallurgy), on a part time basis for 18 months.

The India and France offices of the WIL Group handled and coordinated this effort. 

The Result